Second H2Global tender for the import of hydrogen and hydrogen derivatives.
Tender organised into five lots: four regional and one global.
Delivery points: Germany for regional lots; Germany and the Netherlands for global;
A minimum of EUR 484 million has been allocated for the regional lots and a minimum of EUR 567 million for the global lot. The total amount stands at EUR 2.5 billion, with the potential to increase to close to EUR 3 billion pending final budget approvals.
The five lots for renewable fuels of non-biological origin (RFNBO) are categorised by production region and lot types, which are either product-open or vector-open