Poshydon | Dutch state joins offshore green hydrogen pilot
PosHYdon project, about 80% of all lessons are learned about the offshore production of green hydrogen. This makes the project essential for a smooth roll-out towards large-scale production, as envisaged with the Esbjerg ambitions for 2050.
PosHYdon integrates three energy systems in the North Sea: offshore wind, offshore gas and offshore hydrogen and will take place on Neptune Energy’s Q13a-A platform. This production platform is the first fully green electrified platform in the Dutch North Sea and is located approximately 13 kilometres off the coast of Scheveningen.
The green hydrogen will be blended with the gas and transported to the coast via the existing gas pipeline. To this end, the Ministry of Economic Affairs and Climate Policy has increased the blending specifications from 0.02% to 0.5% hydrogen. The 1 MW electrolyser will follow the wind profile of the Luchterduinen wind farm.
Timeline
- May 2024 – test PosHYdon on land at InVesta, Alkmaar
- Second half of 2024 – PosHYdon live at sea
The green hydrogen will be blended with the gas and transported to the coast via the existing gas pipeline. To this end, the Ministry of Economic Affairs and Climate Policy has increased the blending specifications from 0.02% to 0.5% hydrogen. The 1 MW electrolyser will follow the wind profile of the Luchterduinen wind farm.